

760-305-7064

Stay up to date
As of September 1st 2025 the new general permit is increasing regulations and compliance effecting projects previously grandfathered in from the 2009 permit. The updated Construction General Permit significantly increases the compliance burden by requiring more frequent inspections, enhanced monitoring, and direct adherence to Total Maximum Daily Load (TMDL) limits for projects that discharge into sensitive waterways.
Our Expertise
BTC Inc specializes in comprehensive Stormwater Pollution Prevention Plans (SWPPP), ensuring your site remains in full compliance with all local, state, and NPDES permit standards to avoid costly fines. Our dedication goes beyond paperwork, focusing on the practical implementation of Best Management Practices (BMPs), Erosion and Sediment Control, and long-term asset maintenance
BMP Installs
Maximize site compliance and minimize environmental impact by partnering with us for expert installation of all your project's Best Management Practices (BMPs). We ensure every silt fence, sediment basin, and erosion control measure is professionally implemented to protect water quality and keep your construction on schedule.
SWPPP Inspections
Our Certified SWPPP Inspectors conduct thorough and timely site evaluations, identifying potential issues before they become costly violations. We ensure your project's compliance is always maintained, protecting you from regulatory fines and project delays.
WPCP
For smaller projects, our Water Pollution Control Plan (WPCP) services offer a simplified, cost-effective approach to meeting local stormwater regulations. We develop and implement the necessary controls to prevent runoff and sediment loss without the burden of a full SWPPP with our in-house QSD.